[GMCnet] Restoration. Closing in on $30, 000. With no labor included. [message #296477] |
Tue, 01 March 2016 01:24 |
BobDunahugh
Messages: 2465 Registered: October 2010 Location: Cedar Rapids, IA
Karma:
|
Senior Member |
|
|
Almost done with everything on the bottom side. Tomorrow put both fuel pumps in, change trans fluid, and filter. All fuel, and vapor rubber line were done last week. Gas tanks cleaned, and installed with steel lines on the top of the tanks. Gas tank heat shield's installed. Brake system components in, and bleed. Bleeding went well, and in under 20 minutes. Rear wheel bearings greased with new seals. Quad bag system installed. All wiring under the floor removed, cleaned, fixed, and put in small plastic conduits. All interior wiring got the same treatment. 9- 110 volt, 10 - 12 volt, and 2 inverter circuits. New roof TV antenna, and 100 ft of all new coax cable with booster. 7 new Eagle rims, and tires installed tonight. Full size ADA approved porcelain toilet, porcelain bath sink with faucet, kitchen sink with pull down sprayer faucet, and 2 new holding tanks with drain valves arrived today. Got the tanks from Jim K at Applied. Very nice holding tanks, and valves. Then finish welding the entry door. Wed. start cutting the body for the 36 inch door. Other then that. I have nothing to do.Bob DunahughMember GMCMI.
_______________________________________________
GMCnet mailing list
Unsubscribe or Change List Options:
http://list.gmcnet.org/mailman/listinfo/gmclist_list.gmcnet.org
|
|
|