It has begun [message #229590] |
Tue, 12 November 2013 19:16 |
kerry pinkerton
Messages: 2565 Registered: July 2012 Location: Harvest, Al
Karma:
|
Senior Member |
|
|
The bed frame with the hideaway table was only one part of my winters interior project. The overhead cabinets behind the cockpit have been removed as will the overhead kitchen cabinets.
Wood had been purchased and cabinet making will commence shortly...probably tomorrow. Today we went looking at store bought cabinets and I decided it was simpler to build the doors the size I want than modify new stuff...considerably less expensive also.
Once the cabinets are built and test fit but before they are installed permanently, I'll pull the drivers side wall and insulate before recovering with FRP with glued on vinyl. Already did the passenger side.
Headliner will be FRP with something glued to it. Thinking a white or off white vinyl.
But once the wall and ceiling are out and before ANYTHING goes in, I'm going to find and stop any leaks.
Kerry Pinkerton - North Alabama
Had 5 over the years. Currently have a '06 Fleetwood Discovery 39L
|
|
|