electrical pane rebuild [message #298206] |
Sun, 27 March 2016 23:25 |
Jack Ramsey
Messages: 82 Registered: December 2012 Location: Tulare, CA
Karma: 1
|
Member |
|
|
http://www.gmcmhphotos.com/photos/ramsey-rebuild/p60301-electrical-panel-rebuild.html
I took a couple of ideas and incorporated then into the new system. needed an area with ventilation for tthe inverter-transfer-switch-charger, so the area under the stove made sense, plus not putting it back in, and complete separation from any propane. one of the digital voltage meters DOA. plug in the 50amp cord, check the voltages and wiring with the testers already plugged in, and THEN power the main panel up via the lower left 50 amp circuit breaker. The single box above the WFCO is the manual timer for the new electric water heater.
Jack Ramsey
Tulare, CA
TZE165V101526
1975 Palm Beach
[Updated on: Sun, 27 March 2016 23:27] Report message to a moderator
|
|
|