working for an underground company, I agree with Matt, you can't have enough conduits exiting the facility.
what people do forget to install, and if you are using steel siding for sure, is run a conduits for low voltage. even just a 1" pvc under the concrete to go from one side of the building accross to the other.
I have ran conduit out of a steel building a few times to a simple telephone pole. that way, you can put a wi-fi access point external to the steel structure in order for wireless cameras, and other items to work. have installed many weboost wireless repeaters on steel pole barns, so you have cell signal inside.