Re: [GMCnet] One ton install almost complete?? [message #150440] |
Tue, 22 November 2011 11:52 |
KB
Messages: 1262 Registered: September 2009
Karma: 0
|
Senior Member |
|
|
> Glad to hear it Karen. I'll buy the parts and bring my coach over tomorrow. Could I have it back in 2 weeks ;~)
Nah, take it straight to Manny's -- no need to haul those heavy parts around
and you'll have it back in a day or two. He's FAST, especially if you can
just get the heck out of his way.
Karen
1973 23'
1975 26'
_______________________________________________
GMCnet mailing list
Unsubscribe or Change List Options:
http://temp.gmcnet.org/cgi-bin/mailman/listinfo/gmclist
Karen
1975 26'
San Jose, CA
|
|
|
Re: [GMCnet] One ton install almost complete?? [message #150442 is a reply to message #150440] |
Tue, 22 November 2011 12:16 |
Gary Berry
Messages: 1002 Registered: May 2005
Karma: -1
|
Senior Member |
|
|
When Manny did mine at the SOOR, I just made sure I was always on the
OTHER side of the motorhome from him. Helped with the dis-assembly and
re-assembly as much as I could, but always on the OTHER side of the
motorhome. I think he has a process in his head that he goes through
so that he is assured that every nut and bolt is tightened and
checked. Took about 7 hours. He's a blast to work with if you ever get
a chance.
>
> Nah, take it straight to Manny's -- no need to haul those heavy parts around
> and you'll have it back in a day or two. He's FAST, especially if you can
> just get the heck out of his way.
>
> Karen
Gary and Diana Berry
73 CL Stretch in Wa.
_______________________________________________
GMCnet mailing list
Unsubscribe or Change List Options:
http://temp.gmcnet.org/cgi-bin/mailman/listinfo/gmclist
|
|
|