isolation pad installation [message #323393] |
Tue, 05 September 2017 11:24 |
tgeiger
Messages: 518 Registered: February 2006 Location: kansas city
Karma:
|
Senior Member |
|
|
Ok, am getting myself ready for installing the new 5/8" pads on the motorhome. Had a couple of questions pertaining to what I see posted as the procedure for it. It looks like the new pads are turned 90 degrees in their installation as to how the old ones seem to be on the coach, where the length of them run in the direction of the steel frame. I know it appears that they are installed at a 90 to allow the SS screws to be placed. Is this ok to install this way? Was wondering about bearing pressure per square inch. Length wise along the frame rail would provide more bearing area per pad. Just wondered if this was any concern. Second question is the replacement of the frame tie down angle in the u-bracket. I understand making one leg of the angle longer but I guess I don't understand how you get the old one out and the new one in? Is it just unbolting it and slipping it out from the u-bolt and then doing the reverse for the new angle?
Thanks,
Tom
76 Eleganza II
Kansas City, Mo
Tom Geiger
76 Eleganza II
KCMO
|
|
|